 |
The Challenge
Quote, price, order and manufacture complex multi-component systems with 100% accuracy.
The Solution!
CS-Enterprise
|

CS-Enterprise Provides Annual Savings of 2% to 4% of Revenues
Reduced quote cycle time (50-80%)
Reduced order entry errors (90-100%)
Reduced order cycle time (50-100%)
Reduced cost per customer interaction (98%)
Reduced engineering support (20-50%)
Increased margin from better quoting (1-3%)
Reduced time to market (2 to 4 times faster)
Decreased Inventories (2-10%)
Increased sales productivity (30 – 50%)
Increased quotes generated (100-300%)
Contact Us Today for an indepth analysis of how our CS solutions can help Increase Your Competitive Advantage
|
|
 |

Visibility / AutoCAD
How do you cut your lead time from 36 to 16 weeks on custom designed and very complex products? Through a combination of process streamlining and focused application software. This prominent manufacturer of high-quality elevator and escalator systems has ramped up Configuration Solutions applications to generate Bills of Material, as well as drawings of these complex configured products. The company is saving about $600,000 of engineering time per year through a combination of CS-Enterprise and AutoCAD.
According to this company: "CS Enterprise has become the heart and soul of our engineering process."
For elevators, which have 1,500-2,000 parts, CS-Enterprise configures all mechanical, electrical and fixture components and assemblies. The order-through-engineering process that once took 8-12 weeks is now down to 2-3 weeks through a combination of process streamlining and automation.
|
 |